<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Citadel Group</title>
	<atom:link href="http://www.citadelgroup.org/feed" rel="self" type="application/rss+xml" />
	<link>http://www.citadelgroup.org</link>
	<description>One Company. One Vision. A World of Difference.</description>
	<lastBuildDate>Mon, 08 Aug 2011 20:00:03 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>IKEA Centennial</title>
		<link>http://www.citadelgroup.org/construction-portfolio/corporate/ikea-centennial</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/corporate/ikea-centennial#comments</comments>
		<pubDate>Mon, 08 Aug 2011 20:00:03 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Corporate]]></category>
		<category><![CDATA[featured]]></category>
		<category><![CDATA[Saunders]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2682</guid>
		<description><![CDATA[This project includes a 1,500-car parking garage, 415,000 sf retail showroom with 50 different room settings and three complete model home interiors, warehouse, a supervised children’s play area, and a 500-seat Swedish specialties restaurant. IKEA Centennial is the first U.S. IKEA store to integrate a geothermal system. This technology involves drilling 130 holes – each [...]]]></description>
			<content:encoded><![CDATA[<p>This project includes a 1,500-car parking garage, 415,000 sf retail showroom with 50 different room settings and three complete model home interiors, warehouse, a supervised children’s play area, and a 500-seat Swedish specialties restaurant. </p>
<p>IKEA Centennial is the first U.S. IKEA store to integrate a geothermal system. This technology involves drilling 130 holes – each 5.5 inches wide and 500 feet deep – into the earth for pipes holding heat-transferring liquid circulating through underground loops to either warm-up or cool-down the temperature inside the store. All of this equates to the one of the largest geothermal systems in the U.S. </p>
<p>In addition, the facility has a 60,000 sf solar array consisting of a 498-kW system, built with 2,212 photovoltaic panels, and will produce approximately 740,000 kWh of electricity annually for the store, the equivalent to reducing 586 tons of carbon dioxide (CO2).</p>
<p>The project was completed approximately 3.5 months early. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/corporate/ikea-centennial/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Comdisco, Inc.</title>
		<link>http://www.citadelgroup.org/construction-portfolio/mission-critical/comdisco-inc</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/mission-critical/comdisco-inc#comments</comments>
		<pubDate>Mon, 27 Jun 2011 11:32:00 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Mission Critical]]></category>
		<category><![CDATA[Choate]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2664</guid>
		<description><![CDATA[This facility is part of Comdisco’s international network of fully-equipped alternate sites, used by customers to recover their enterprise computer systems and data in the event of a service disruption or natural disaster. Comdisco is a leading provider of continuity services, and offers a complete suite of information technology services including managed network services and [...]]]></description>
			<content:encoded><![CDATA[<p>This facility is part of Comdisco’s international network of fully-equipped alternate sites, used by customers to recover their enterprise computer systems and data in the event of a service disruption or natural disaster.  Comdisco is a leading provider of continuity services, and offers a complete suite of information technology services including managed network services and IT control and predictability solutions.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/mission-critical/comdisco-inc/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Network Appliance Campus</title>
		<link>http://www.citadelgroup.org/construction-portfolio/mission-critical/network-appliance-campus</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/mission-critical/network-appliance-campus#comments</comments>
		<pubDate>Mon, 27 Jun 2011 11:29:45 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Mission Critical]]></category>
		<category><![CDATA[Choate]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2659</guid>
		<description><![CDATA[Choate Construction Company has completed numerous projects for Network Appliance, the network storage company based in California, for a total of 422,000 SF. Network Appliance Building 1 This 165,000-SF cold shell building was converted to a warm shell, followed by the completion of 125,000 SF of interior space. Interior environments included approximately 40,000 SF of [...]]]></description>
			<content:encoded><![CDATA[<p>Choate Construction Company has completed numerous projects for Network Appliance, the network storage company based in California, for a total of 422,000 SF.</p>
<p>Network Appliance Building 1<br />
This 165,000-SF cold shell building was converted to a warm shell, followed by the completion of 125,000 SF of interior space.  Interior environments included approximately 40,000 SF of R&#038;D laboratory, training facilities, an executive briefing center as well as open office/systems furniture plan for global support personnel. </p>
<p>Network Appliance RTP Building 2<br />
The next phase of expansion involves the conversion of a cold shell office building to a warm shell state, fitting out approximately 150,000 SF to accommodate customer support, product development, software development and laboratory/data center business unit expansion needs.  </p>
<p>Network Appliance Dedicated Lab &#8211; RTP Building 4<br />
This dedicated lab facility contains over 2,100 racks of data equipment, with the lab environment designed at over 650 watts per square foot.  Over 11,000 tons of cooling capacity is delivered by four (4) 2,800 ton centrifugal chillers served by 8 cooling towers.  Chilled water runs through the coils of eighty (80) 45,000 CFM air handling units which deliver a collective 3.6 million CFM to the laboratory environment.  The structural steel frame is clad in architectural metal panels with weather-proof relief air louvers surrounding almost the entire 3rd level, dedicated solely to the air handling equipment and half of the electrical distribution gear.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/mission-critical/network-appliance-campus/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Concord EFS</title>
		<link>http://www.citadelgroup.org/construction-portfolio/mission-critical/concord-efs</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/mission-critical/concord-efs#comments</comments>
		<pubDate>Mon, 27 Jun 2011 11:28:14 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Mission Critical]]></category>
		<category><![CDATA[Choate]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2653</guid>
		<description><![CDATA[Concord EFS, acquired by First Data, provided ATM, credit card, and payroll pressing services. The 107,000-SF facility provided full-time backup for the Wilmington, Delaware office, featuring 32,000 SF of raised flooring with 2-foot deep access flooring cable and 75,000 SF of office area. Located across from the Dobbins Air Field, special precautions were taken to [...]]]></description>
			<content:encoded><![CDATA[<p>Concord EFS, acquired by First Data, provided ATM, credit card, and payroll pressing services.  The 107,000-SF facility provided full-time backup for the Wilmington, Delaware office, featuring 32,000 SF of raised flooring with 2-foot deep access flooring cable and 75,000 SF of office area.</p>
<p>Located across from the Dobbins Air Field, special precautions were taken to reduce outside noise infiltration.  Triple-glazed Trainer glass out of Chicago was used to achieve maximum noise reduction.  </p>
<p>Redundant N+1 MEP systems increase reliability and ensure the building is always fully operating.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/mission-critical/concord-efs/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Promenade Shops at Saucon Valley</title>
		<link>http://www.citadelgroup.org/construction-portfolio/retail-hospitality/promenade-shops-at-saucon-valley</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/retail-hospitality/promenade-shops-at-saucon-valley#comments</comments>
		<pubDate>Mon, 25 Apr 2011 16:00:33 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Retail / Hospitality]]></category>
		<category><![CDATA[IMC]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2645</guid>
		<description><![CDATA[Over 300,000 SF of new building construction completed Additional project scope added in March Project budget of $16 M was met on this Lump Sum Contract]]></description>
			<content:encoded><![CDATA[<p>Over 300,000 SF of new building construction completed<br />
Additional project scope added in March<br />
Project budget of $16 M was met on this Lump Sum Contract</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/retail-hospitality/promenade-shops-at-saucon-valley/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Spring Mill Senior Living</title>
		<link>http://www.citadelgroup.org/construction-portfolio/institutional/spring-mill-senior-living</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/institutional/spring-mill-senior-living#comments</comments>
		<pubDate>Mon, 25 Apr 2011 15:07:40 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Institutional]]></category>
		<category><![CDATA[IMC]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2635</guid>
		<description><![CDATA[100,000 SF 96 Unit senior housing project Alzheimer’s / Skilled nursing wing Commercial Kitchen and multiple dining facilities]]></description>
			<content:encoded><![CDATA[<p>100,000 SF<br />
96 Unit senior housing project<br />
Alzheimer’s / Skilled nursing wing<br />
Commercial Kitchen and multiple dining facilities</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/institutional/spring-mill-senior-living/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Cedar Cliff High School Addition &amp; Renovations</title>
		<link>http://www.citadelgroup.org/construction-portfolio/education/cedar-cliff-high-school-addition-renovations</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/education/cedar-cliff-high-school-addition-renovations#comments</comments>
		<pubDate>Mon, 25 Apr 2011 14:50:26 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Education]]></category>
		<category><![CDATA[IMC]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2629</guid>
		<description><![CDATA[IMC added 16,000 square feet to Cedar Cliff High School. These additions included a new library along with expansion of the existing lobby and gymnasium. Other upgrades included converting the existing cafeteria into a new food court, fitting out the existing library shell into 8 new classrooms, renovations to the locker rooms and team rooms, [...]]]></description>
			<content:encoded><![CDATA[<p>IMC added 16,000 square feet to Cedar Cliff High School. These additions included a new library along with expansion of the existing lobby and gymnasium. Other upgrades included converting the existing cafeteria into a new food court, fitting out the existing library shell into 8 new classrooms, renovations to the locker rooms and team rooms, relocation of the sports medicine facility, accessibility upgrades and adding air conditioning to all education spaces.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/education/cedar-cliff-high-school-addition-renovations/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Midd West High School</title>
		<link>http://www.citadelgroup.org/construction-portfolio/education/midd-west-high-school</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/education/midd-west-high-school#comments</comments>
		<pubDate>Mon, 25 Apr 2011 14:32:03 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Education]]></category>
		<category><![CDATA[LEED]]></category>
		<category><![CDATA[IMC]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2623</guid>
		<description><![CDATA[This education project consists of a 170,000 square foot addition, new gymnasium and cafeteria and a 23,000 square foot renovation to accommodate 800 students. The high school has designated to achieve LEED Gold rating and incorporates unique design features that encompass the principles of “ green” design. The building is an example of social, environmental [...]]]></description>
			<content:encoded><![CDATA[<p>This education project consists of a 170,000 square foot addition, new gymnasium and cafeteria and a 23,000 square foot renovation to accommodate 800 students. The high school has designated to achieve LEED Gold rating and incorporates unique design features that encompass the principles of “ green” design. The building is an example of social, environmental and fiscal responsibility for the future of educational construction.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/education/midd-west-high-school/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Vertical Screen</title>
		<link>http://www.citadelgroup.org/construction-portfolio/corporate/vertical-screen</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/corporate/vertical-screen#comments</comments>
		<pubDate>Mon, 25 Apr 2011 14:22:49 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Corporate]]></category>
		<category><![CDATA[LEED]]></category>
		<category><![CDATA[IMC]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2615</guid>
		<description><![CDATA[IMC is currently building Vertical Screen’s new corporate headquarters. The 49,600 SF office building features a vaulted wood roof with integrated photovoltaic, geothermal heat exchange and rainwater harvesting to achieve a LEED certification goal of Platinum.]]></description>
			<content:encoded><![CDATA[<p>IMC is currently building Vertical Screen’s new corporate headquarters. The 49,600 SF office building features a vaulted wood roof with integrated photovoltaic, geothermal heat exchange and rainwater harvesting to achieve a LEED certification goal of Platinum.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/corporate/vertical-screen/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Follett Educational Services</title>
		<link>http://www.citadelgroup.org/construction-portfolio/mission-critical/follett-educational-services</link>
		<comments>http://www.citadelgroup.org/construction-portfolio/mission-critical/follett-educational-services#comments</comments>
		<pubDate>Wed, 20 Apr 2011 18:09:42 +0000</pubDate>
		<dc:creator>melissa</dc:creator>
				<category><![CDATA[Mission Critical]]></category>
		<category><![CDATA[Krusinski]]></category>

		<guid isPermaLink="false">http://www.citadelgroup.org/?p=2610</guid>
		<description><![CDATA[This 9,000-square-foot high tech data center, designed to house some 200 servers and operate as a centralized data hub for more than six Follett companies includes: • Installation of overhead floor membrane • Installation of raised access floor system • Installation of N + 1 configuration for major mechanical and electrical infrastructure components • Installation [...]]]></description>
			<content:encoded><![CDATA[<p>This 9,000-square-foot high tech data center, designed to house some 200 servers and operate as a centralized data hub for more than six Follett companies includes: </p>
<p>•	Installation of overhead floor membrane<br />
•	Installation of raised access floor system<br />
•	Installation of N + 1 configuration for major mechanical and electrical infrastructure components<br />
•	Installation of dual fire suppression system which included gaseous system supplemented with pre-action, double interlocked, dry-pipe sprinkler system<br />
•	Installation of dedicated redundant AC electrical power service with a UPS system and 5,000 gallon back-up generator for 24&#215;7 facility operation<br />
•	Installation of complex HVAC system comprising four 20-ton units<br />
•	800A master switch board with automatic transfer switch (ATS) by-pass<br />
•	Hydrogen detection system with exhaust fan link<br />
•	Six (6) CRAC units (Liebert)<br />
•	Four (4) 150Kva UPS units with wet cell batteries<br />
•	Four (4) 400A PDU distribution cabinets<br />
•	Single tier cable ladder rack with Panduit cable management system<br />
•	Two (2) fiber hand holes for optional fiber service<br />
•	Tier 2 Data Center</p>
]]></content:encoded>
			<wfw:commentRss>http://www.citadelgroup.org/construction-portfolio/mission-critical/follett-educational-services/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

